merging several installs into one per-host parameterized task
multiple install calls in different tasks are bad, since each install takes 20 minutes.
This changes to a single per-host parameterized install line
tested on massive004
Downtime: Monday, July 9, 11:00–13:00 — scheduled maintenance.
multiple install calls in different tasks are bad, since each install takes 20 minutes.
This changes to a single per-host parameterized install line
tested on massive004